Skip to main content



      Home
Home » Archived » BIRT » discrepancy between preview in eclipse and deployed birt.war
discrepancy between preview in eclipse and deployed birt.war [message #73888] Wed, 14 September 2005 11:17
Eclipse UserFriend
Originally posted by: haakon.amazon.com

I've a report which behaves differently when deployed with the viewer
(birt.war) than when in the eclipse preview.

I am attempting to chart time series data, ie dates on the x-axis, simple
numeric values on the y-axis. I am using the chart type "scatter chart".
Everything works beatifully in the eclipse preview, and the eclipse
"preview as html". However, when I copy the report into the webapp and
view it there, it fails with what looks like date parsing problems.

All dates appear to be interpreted as '0006-06-27', so all my points on
the chart end up in a vertical line. The dates being passed in are
displayed correctly elsewhere on the report, in a table.

using:
birt-report-framework-1_0_1.zip
birt-runtime-1_0_1

It would seem that somehow the deployed viewer is running different code
than the eclipse preview. Any ideas?

cheers,
Haakon
Previous Topic:TextDataHandle problem
Next Topic:Can styles be changed during rendering time based on target?
Goto Forum:
  


Current Time: Fri May 09 16:20:31 EDT 2025

Powered by FUDForum. Page generated in 0.03420 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top