Home » General (non-technical) » Eclipse Foundation » BPMN process of the Due Diligence Process
| | | |
Re: BPMN process of the Due Diligence Process [message #52377 is a reply to message #52350] |
Wed, 05 March 2008 09:44   |
Eclipse User |
|
|
|
Originally posted by: atoulme.intalio.com
Well, I would have to model it first, it takes time to analyze the
process and make it pretty - well, as pretty as it can get.
I opened a bug to track that:
https://bugs.eclipse.org/bugs/show_bug.cgi?id=221518
I'll add you in CC.
Thanks,
Antoine
Wayne Beaton wrote:
> Can you post a screenshot of page 2?
>
> Wayne
>
> On Tue, 2008-03-04 at 20:03 +0100, Antoine Toulme wrote:
>> Hi all,
>>
>> we have created a BPMN sample using the BPMN modeler that represents the
>> first page of the due diligence process.
>>
>> A screenshot is available here:
>> http://dev.eclipse.org/svnroot/stp/org.eclipse.stp.bpmn/trun k/samples/bpmn_samples/eclipse%20IP%20process/due%20diligenc e.jpg
>>
>> You can grab the whole project here:
>> http://dev.eclipse.org/svnroot/stp/org.eclipse.stp.bpmn/trun k/samples/bpmn_samples/eclipse%20IP%20process
>>
>> Let us know if you like it, feel free to open a bug against the STP BPMN
>> component if you see an error, or want more like this one.
>>
>> Regards,
>>
>> Antoine
>>
>
--
Intalio, the Open Source BPMS Company
<a href="http://www.intalio.com">http://www.intalio.com</a>
<a href="http://bpms.intalio.com">Community website</a>
|
|
|
Re: BPMN process of the Due Diligence Process [message #52404 is a reply to message #52377] |
Wed, 05 March 2008 11:42   |
Eclipse User |
|
|
|
Oh... I just assumed. Need to stop doing that...
Wayne
On Wed, 2008-03-05 at 15:44 +0100, Antoine Toulme wrote:
> Well, I would have to model it first, it takes time to analyze the
> process and make it pretty - well, as pretty as it can get.
>
> I opened a bug to track that:
> https://bugs.eclipse.org/bugs/show_bug.cgi?id=221518
>
> I'll add you in CC.
>
> Thanks,
>
> Antoine
>
> Wayne Beaton wrote:
> > Can you post a screenshot of page 2?
> >
> > Wayne
> >
> > On Tue, 2008-03-04 at 20:03 +0100, Antoine Toulme wrote:
> >> Hi all,
> >>
> >> we have created a BPMN sample using the BPMN modeler that represents the
> >> first page of the due diligence process.
> >>
> >> A screenshot is available here:
> >> http://dev.eclipse.org/svnroot/stp/org.eclipse.stp.bpmn/trun k/samples/bpmn_samples/eclipse%20IP%20process/due%20diligenc e.jpg
> >>
> >> You can grab the whole project here:
> >> http://dev.eclipse.org/svnroot/stp/org.eclipse.stp.bpmn/trun k/samples/bpmn_samples/eclipse%20IP%20process
> >>
> >> Let us know if you like it, feel free to open a bug against the STP BPMN
> >> component if you see an error, or want more like this one.
> >>
> >> Regards,
> >>
> >> Antoine
> >>
> >
>
>
|
|
| | |
Re: BPMN process of the Due Diligence Process [message #52629 is a reply to message #52602] |
Tue, 11 March 2008 09:33  |
Eclipse User |
|
|
|
Originally posted by: atoulme.intalio.com
Eike Stepper wrote:
> Hi Antoine,
>
> You re-proofed that a picture is (more) worth than 1000 words!!! I hate
> these lengthy verbal descritpions of processes but such diagrams give a
> pretty clear picture at once. Good work ;-)
Thanks!
>
> One semantic question: What is the left-most node "Receive Code" in the
> "Due Dilligence Process" lane good for?
It's a event-based gateway, decorated with the BPMN 1.1 specification
recommandation. If you are familiar with BPMN 1.0, it used to be a star
inside the gateway.
The event-based gateway is waiting for one of its events or a timer to
activate, and starts execution of the selected branch.
>
> Enjoy your weekend
> /Eike
>
>
> Antoine Toulme schrieb:
>> Hi all,
>>
>> we have created a BPMN sample using the BPMN modeler that represents
>> the first page of the due diligence process.
>>
>> A screenshot is available here:
>> http://dev.eclipse.org/svnroot/stp/org.eclipse.stp.bpmn/trun k/samples/bpmn_samples/eclipse%20IP%20process/due%20diligenc e.jpg
>>
>>
>> You can grab the whole project here:
>> http://dev.eclipse.org/svnroot/stp/org.eclipse.stp.bpmn/trun k/samples/bpmn_samples/eclipse%20IP%20process
>>
>>
>> Let us know if you like it, feel free to open a bug against the STP
>> BPMN component if you see an error, or want more like this one.
>>
>> Regards,
>>
>> Antoine
>>
--
Intalio, the Open Source BPMS Company
<a href="http://www.intalio.com">http://www.intalio.com</a>
<a href="http://bpms.intalio.com">Community website</a>
|
|
|
Goto Forum:
Current Time: Fri May 02 22:24:30 EDT 2025
Powered by FUDForum. Page generated in 0.04193 seconds
|