SysML Activity diagram with probabilities [message #1522598] |
Mon, 22 December 2014 12:08 |
Joost Kraaijeveld Messages: 273 Registered: July 2009 |
Senior Member |
|
|
Hi,
Is there a tutorial or example available of a SysML activity diagram
with probabilities?
I would like to create an activity diagram that only has 1 initial node,
1 action and 2 flow finals, 1 reached with a probability of .75 and 1
with a probability of .25
TIA
Joost
Cheers,
Joost
|
|
|
Re: SysML Activity diagram with probabilities [message #1547990 is a reply to message #1522598] |
Mon, 05 January 2015 19:35 |
|
Hi Joost,
You can apply the <<Probability>> stereotype to the flows and then specify a value for the stereotype's "probability" value specification. At least, the information will be in the model.
However, I haven't figured out how to show this on the diagram...
/Charles
/Charles Rivet
|
|
|
Re: SysML Activity diagram with probabilities [message #1551249 is a reply to message #1547990] |
Wed, 07 January 2015 14:02 |
Joost Kraaijeveld Messages: 273 Registered: July 2009 |
Senior Member |
|
|
Hi Charles,
Thanks for the response. I managed to create the attached model (1
class, 1 activity).
If I validate the model then I get 1 error and 1 warning and I do not
know how to solve this. The error and warning are:
Error The required feature
'sysml::activities::Probability::base_ParameterSet' of 'Probability'
must be set <<Probability>> <Control Flow> FailureEdge
SysMLmodel::Object::Activity1 EMF Problem
Warning Named element SysMLmodel::Object::Activity1::SuccesEdge is not
owned by a namespace, but it has visibility. <<Probability>> <Control
Flow> SuccesEdge SysMLmodel::Object::Activity1 EMF Problem
Do you have any idea?
TIA
Joost
Cheers,
Joost
|
|
|
Powered by
FUDForum. Page generated in 0.01840 seconds