Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Newcomers » Newcomers » Optional DATE Parameter in BIRT
Optional DATE Parameter in BIRT [message #1401606] Tue, 15 July 2014 22:07 Go to next message
Darryl Rogers is currently offline Darryl RogersFriend
Messages: 5
Registered: September 2012
Junior Member
I have an optional Date parameter in BIRT. When I import the report into MAXIMO the parameter becomes required. Simply unchecking the required field in Report Admin is not an option. If I do that it simply gives me an error.

Does anybody have a solution for this?
Re: Optional DATE Parameter in BIRT [message #1401689 is a reply to message #1401606] Wed, 16 July 2014 01:14 Go to previous message
Russell Bateman is currently offline Russell BatemanFriend
Messages: 3798
Registered: July 2009
Location: Provo, Utah, USA
Senior Member

On 07/15/2014 04:08 PM, Darryl Rogers wrote:
> I have an optional Date parameter in BIRT. When I import the report
> into MAXIMO the parameter becomes required. Simply unchecking the
> required field in Report Admin is not an option. If I do that it simply
> gives me an error.
>
> Does anybody have a solution for this?

Repost in the BIRT forum?
Previous Topic:Eclipse on 64-bit Windows 7
Next Topic:What Eclipse Package to Start With?
Goto Forum:
  


Current Time: Fri Apr 19 22:53:47 GMT 2024

Powered by FUDForum. Page generated in 0.09449 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top