I am trying to get my workflow to fit with Mylyn, and still having
a few problems.

Sometimes I find myself in the situation that I activate a task,
work on some files, and then go to the synchronize view only to
discover that the task and its associated files to not appear there.

So this set me thinking (always dangerous). When should I expect to
see a task appear in the sync view? My intuition says it should
appear when I first save a changed file while working on a task.

I am using Europa, and Subclipse with Trac.

David
Re: When should a task appear in the Synchonize view? [message #12810 is a reply to message #12790] Mon, 16 July 2007 11:39 Go to previous messageGo to next message
Dave Syer is currently offline Dave SyerFriend
Messages: 95
Registered: July 2009
Member
I find I sometimes have to refresh the Synchronize... view (and enable the
Task-based Change Sets) before the changes show up for commit under the
Task.

"David Goodenough" <david.goodenough@btconnect.com> wrote in message
news:f7fasl$dar$1@build.eclipse.org...
> So this set me thinking (always dangerous). When should I expect to
> see a task appear in the sync view? My intuition says it should
> appear when I first save a changed file while working on a task.
Re: When should a task appear in the Synchonize view? [message #14191 is a reply to message #12810] Tue, 17 July 2007 16:18 Go to previous messageGo to next message
Eclipse UserFriend
Originally posted by: beatmik.acm.org

Dave Syer wrote:
> I find I sometimes have to refresh the Synchronize... view (and enable the
> Task-based Change Sets) before the changes show up for commit under the
> Task.
>
> "David Goodenough" <david.goodenough@btconnect.com> wrote in message
> news:f7fasl$dar$1@build.eclipse.org...
>> So this set me thinking (always dangerous). When should I expect to
>> see a task appear in the sync view? My intuition says it should
>> appear when I first save a changed file while working on a task.

Yes, the Synchronize view still has refresh problems when in
models-based mode (the preferred way of working since you can see both
Incoming and Outgoing change sets at the same time).

David: another reason you may not be seeing the task change sets is that
you do not have the "Mylyn Bridge: Eclipse SDK" feature installed. I've
detailed this and other change set troubleshooting information at:

http://wiki.eclipse.org/Mylyn_FAQ#Why_does_task_change_set_n ot_appear_when_I_modify_files.3F


If that FAQ entry does not address your problem please post.

Mik
Re: When should a task appear in the Synchonize view? [message #14276 is a reply to message #14191] Wed, 18 July 2007 06:31 Go to previous messageGo to next message
Dave Syer is currently offline Dave SyerFriend
Messages: 95
Registered: July 2009
Member
I do have the Mylyn Bridge component mentioned.

I did not find the FAQ very helpful - it talked about "models mode" which is
a new concept for me and I can't see the switch mentioned in the article to
toggle it (possibly because it is CVS-specific and I am using SVN, but I
wasn't able to tell from reading the FAQ?).

"Mik Kersten" <beatmik@acm.org> wrote in message
news:f7iq5a$ueb$1@build.eclipse.org...

> David: another reason you may not be seeing the task change sets is that
> you do not have the "Mylyn Bridge: Eclipse SDK" feature installed. I've
> detailed this and other change set troubleshooting information at:
>
> http://wiki.eclipse.org/Mylyn_FAQ#Why_does_task_change_set_n ot_appear_when_I_modify_files.3F
Re: When should a task appear in the Synchonize view? [message #19394 is a reply to message #14276] Thu, 26 July 2007 05:54 Go to previous message
Eclipse UserFriend
Originally posted by: beatmik.acm.org

Dave Syer wrote:
> I do have the Mylyn Bridge component mentioned.
>
> I did not find the FAQ very helpful - it talked about "models mode" which is
> a new concept for me and I can't see the switch mentioned in the article to
> toggle it (possibly because it is CVS-specific and I am using SVN, but I
> wasn't able to tell from reading the FAQ?).

The documentation is for the Mylyn-distributed integration only (i.e.
CVS). I added the following clarifications for Subclipse.

Mik

-----

http://wiki.eclipse.org/Mylyn_User_Guide#Configuring_the_Syn chronize_view_for_change_sets

Note that not all tools may support both modes. The instructions below
are for the CVS support included with Mylyn. Refer to the Mylyn
integration documentation for your source control plug-in for additional
instructions for Mylyn change set integration, if available.
....
* Subclipse users: note that Subclipse 1.2.3 and later functions as if
in the models mode described below, so the additional configuration step
is not needed.
Re: When should a task appear in the Synchonize view? [message #572195 is a reply to message #12790] Mon, 16 July 2007 11:39 Go to previous message
Dave Syer is currently offline Dave SyerFriend
Messages: 95
Registered: July 2009
Member
I find I sometimes have to refresh the Synchronize... view (and enable the
Task-based Change Sets) before the changes show up for commit under the
Task.

"David Goodenough" <david.goodenough@btconnect.com> wrote in message
news:f7fasl$dar$1@build.eclipse.org...
> So this set me thinking (always dangerous). When should I expect to
> see a task appear in the sync view? My intuition says it should
> appear when I first save a changed file while working on a task.
Re: When should a task appear in the Synchonize view? [message #572690 is a reply to message #12810] Tue, 17 July 2007 16:18 Go to previous message
Mik Kersten is currently offline Mik KerstenFriend
Messages: 287
Registered: July 2009
Senior Member
Dave Syer wrote:
> I find I sometimes have to refresh the Synchronize... view (and enable the
> Task-based Change Sets) before the changes show up for commit under the
> Task.
>
> "David Goodenough" <david.goodenough@btconnect.com> wrote in message
> news:f7fasl$dar$1@build.eclipse.org...
>> So this set me thinking (always dangerous). When should I expect to
>> see a task appear in the sync view? My intuition says it should
>> appear when I first save a changed file while working on a task.

Yes, the Synchronize view still has refresh problems when in
models-based mode (the preferred way of working since you can see both
Incoming and Outgoing change sets at the same time).

David: another reason you may not be seeing the task change sets is that
you do not have the "Mylyn Bridge: Eclipse SDK" feature installed. I've
detailed this and other change set troubleshooting information at:

http://wiki.eclipse.org/Mylyn_FAQ#Why_does_task_change_set_n ot_appear_when_I_modify_files.3F


If that FAQ entry does not address your problem please post.

Mik
Re: When should a task appear in the Synchonize view? [message #572899 is a reply to message #14191] Wed, 18 July 2007 06:31 Go to previous message
Dave Syer is currently offline Dave SyerFriend
Messages: 95
Registered: July 2009
Member
I do have the Mylyn Bridge component mentioned.

I did not find the FAQ very helpful - it talked about "models mode" which is
a new concept for me and I can't see the switch mentioned in the article to
toggle it (possibly because it is CVS-specific and I am using SVN, but I
wasn't able to tell from reading the FAQ?).

"Mik Kersten" <beatmik@acm.org> wrote in message
news:f7iq5a$ueb$1@build.eclipse.org...

> David: another reason you may not be seeing the task change sets is that
> you do not have the "Mylyn Bridge: Eclipse SDK" feature installed. I've
> detailed this and other change set troubleshooting information at:
>
> http://wiki.eclipse.org/Mylyn_FAQ#Why_does_task_change_set_n ot_appear_when_I_modify_files.3F
Re: When should a task appear in the Synchonize view? [message #575465 is a reply to message #14276] Thu, 26 July 2007 05:54 Go to previous message
Mik Kersten is currently offline Mik KerstenFriend
Messages: 287
Registered: July 2009
Senior Member
Dave Syer wrote:
> I do have the Mylyn Bridge component mentioned.
>
> I did not find the FAQ very helpful - it talked about "models mode" which is
> a new concept for me and I can't see the switch mentioned in the article to
> toggle it (possibly because it is CVS-specific and I am using SVN, but I
> wasn't able to tell from reading the FAQ?).

The documentation is for the Mylyn-distributed integration only (i.e.
CVS). I added the following clarifications for Subclipse.

Mik

-----

http://wiki.eclipse.org/Mylyn_User_Guide#Configuring_the_Syn chronize_view_for_change_sets

Note that not all tools may support both modes. The instructions below
are for the CVS support included with Mylyn. Refer to the Mylyn
integration documentation for your source control plug-in for additional
instructions for Mylyn change set integration, if available.
....
* Subclipse users: note that Subclipse 1.2.3 and later functions as if
in the models mode described below, so the additional configuration step
is not needed.
Previous Topic:dev build and XPlanner connector preview
Next Topic:Question regarding saved context
Goto Forum:
  


Current Time: Thu Apr 18 02:15:07 GMT 2024

Powered by FUDForum. Page generated in 0.02996 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top