Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Eclipse Projects » Mylyn » Own connector, performQuery, task summary
Own connector, performQuery, task summary [message #901890] Tue, 14 August 2012 21:51 Go to next message
Paul Weingardt is currently offline Paul WeingardtFriend
Messages: 2
Registered: August 2012
Junior Member
Hello,
I am writing my own connector and it works well so far (that means I can create and edit tasks).
Except for one thing:
I can edit the summary-field in the task editor, but Eclipse doesn't use this attribute in the task-list (that means, that my list looks like "4:", "5:", where 4 and 5 are the tasks' ids. It should be something like "4: this is a summary") or in the task-editor-tab.

I mean the red parts:
index.php/fa/11186/0/

I think I missed something completely, but I can't figure out what.

Thanks for any help and sorry for my bad english.

nobody44
  • Attachment: task.png
    (Size: 41.57KB, Downloaded 586 times)
Re: Own connector, performQuery, task summary [message #902012 is a reply to message #901890] Wed, 15 August 2012 13:44 Go to previous message
Paul Weingardt is currently offline Paul WeingardtFriend
Messages: 2
Registered: August 2012
Junior Member
Hi,
Yes... I am dumb.
I didn't implement the updateTaskFromTaskData method. My method was empty...
Thanks for reading anyway.

nobody44
Previous Topic:Mylyn(Incubator) Generic Web Repository Connector
Next Topic:Automated git Branch Switching
Goto Forum:
  


Current Time: Tue Mar 19 07:02:58 GMT 2024

Powered by FUDForum. Page generated in 0.02364 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top