Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Archived » Sapphire » Re-scheduling Sapphire 0.3.1 release
Re-scheduling Sapphire 0.3.1 release [message #688084] Thu, 23 June 2011 22:01 Go to next message
Konstantin Komissarchik is currently offline Konstantin KomissarchikFriend
Messages: 1077
Registered: July 2009
Senior Member
The current schedule has Sapphire 0.3.1 shipping on September 1st while Indigo SR1 is scheduled for September 30th. That mis-alignment was driven by Oracle adopter requirements. These requirements no longer exist and I would like to re-align our 0.3.1 release with Indigo SR1.

Would this change in schedule present a problem for other adopters? We can schedule multiple 0.3.x releases if necessary, but if I don't hear otherwise, I will assume that the schedule change is ok with everyone.

- Konstantin
Re: Re-scheduling Sapphire 0.3.1 release [message #723526 is a reply to message #688084] Thu, 08 September 2011 18:25 Go to previous messageGo to next message
Kamesh Sampath is currently offline Kamesh SampathFriend
Messages: 213
Registered: July 2009
Senior Member
Konstantin,

Is it possible to include some bug fixes like InitialValueServices, Doctype etc., as part of the 0.3.1 release ? I am planning to use them in my Liferay IDE contribution where these fixes are very essential.

We can have other bugs like XMLSchema, Content Assist as part of 0.4 release or next 0.3.x release .

Let me know your thoughts.

~Kamesh
Re: Re-scheduling Sapphire 0.3.1 release [message #723573 is a reply to message #723526] Thu, 08 September 2011 20:51 Go to previous messageGo to next message
Konstantin Komissarchik is currently offline Konstantin KomissarchikFriend
Messages: 1077
Registered: July 2009
Senior Member
I do not believe that is going to be feasible. Those changes are tied up with other 0.4 work which cannot be backported to 0.3.x as it isn't backwards compatible.

- Konstantin
Re: Re-scheduling Sapphire 0.3.1 release [message #723649 is a reply to message #723573] Fri, 09 September 2011 04:16 Go to previous messageGo to next message
Kamesh Sampath is currently offline Kamesh SampathFriend
Messages: 213
Registered: July 2009
Senior Member
So when are we planning for 0.4 ?
Re: Re-scheduling Sapphire 0.3.1 release [message #723811 is a reply to message #723649] Fri, 09 September 2011 14:41 Go to previous message
Konstantin Komissarchik is currently offline Konstantin KomissarchikFriend
Messages: 1077
Registered: July 2009
Senior Member
The 0.4 release is tentatively planned for early December. The exact working date is December 1st.

You can find information like this on the project summary page or on the pages of various releases...

http://www.eclipse.org/projects/project_summary.php?projectid=technology.sapphire
http://www.eclipse.org/sapphire/releases/
http://www.eclipse.org/sapphire/releases/0.4/

- Konstantin
Previous Topic:DiagramEditor - Manage nodes and edges separatly
Next Topic:Sapphire at EclipseCon Europe 2011
Goto Forum:
  


Current Time: Thu Mar 28 21:54:50 GMT 2024

Powered by FUDForum. Page generated in 0.02594 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top