Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Eclipse Projects » GEF » [Zest] Layer for a grid(time line scale on layer)
[Zest] Layer for a grid [message #660975] Tue, 22 March 2011 14:41 Go to next message
Hannes  is currently offline Hannes Friend
Messages: 14
Registered: March 2011
Junior Member
I have another problem Wink

The nodes drawn on the graph depending on a time line.
I want to draw a grid or something to show at which time
a node starts.
One idea is to add a layer to the graph where i draw a
time line ...but i don t know how to add this layer.

mfg
Re: [Zest] Layer for a grid [message #662839 is a reply to message #660975] Fri, 01 April 2011 07:53 Go to previous message
Hannes  is currently offline Hannes Friend
Messages: 14
Registered: March 2011
Junior Member
Now I solved the problem...not with a seperate layer
I draw for every time step a node up and down and
draw a connection ... then I set the nodes invisible Wink
Previous Topic:Figure Drag & Drop using ALT key
Next Topic:Modify model when a connection is created
Goto Forum:
  


Current Time: Tue Apr 23 08:41:10 GMT 2024

Powered by FUDForum. Page generated in 0.03251 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top