Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Eclipse Projects » Mylyn » JIRA Connector and Subtasks
JIRA Connector and Subtasks [message #65829] Mon, 23 February 2009 17:11 Go to next message
Felix Dorner is currently offline Felix DornerFriend
Messages: 676
Registered: July 2009
Senior Member
Hey,

in the JIRA Web interface I can convert subtasks into tasks. This
conversion isn't reflected in the task-list view, even after synchronizing.

I also had similar problems when I renamed tasks (The new name is shown
correctly in the task editor, but doesn't get updated in the task list.

Anything that I can do about this? I can only think of re-creating my
task filter, but I'm afraid that this might wipe out my my task contexts?

Thanks Felix
Re: JIRA Connector and Subtasks [message #66129 is a reply to message #65829] Fri, 06 March 2009 04:03 Go to previous message
Steffen Pingel is currently offline Steffen PingelFriend
Messages: 706
Registered: July 2009
Senior Member
> in the JIRA Web interface I can convert subtasks into tasks. This
> conversion isn't reflected in the task-list view, even after
> synchronizing.

That sounds like a bug. The JIRA connector may fail to recognize that the
task has changed. Please file a bug for this:

http://www.eclipse.org/mylyn/support/

> I also had similar problems when I renamed tasks (The new name is shown
> correctly in the task editor, but doesn't get updated in the task list.

The task summary displayed in the task list reflects the summary of the
issue in the repository. It will be updated once an issue is submitted.

> Anything that I can do about this? I can only think of re-creating my
> task filter, but I'm afraid that this might wipe out my my task contexts?

Have you tried using the Synchronize button in the task editor?

Deleting a query will not delete task contexts as long as the tasks are not
deleted from the Unmatched category. I don't think this will help though, I
would recommend manually synchronizing stale tasks by pressing F5 in the
Task List or using the Task Editor.

Steffen
Re: JIRA Connector and Subtasks [message #596520 is a reply to message #65829] Fri, 06 March 2009 04:03 Go to previous message
Steffen Pingel is currently offline Steffen PingelFriend
Messages: 706
Registered: July 2009
Senior Member
> in the JIRA Web interface I can convert subtasks into tasks. This
> conversion isn't reflected in the task-list view, even after
> synchronizing.

That sounds like a bug. The JIRA connector may fail to recognize that the
task has changed. Please file a bug for this:

http://www.eclipse.org/mylyn/support/

> I also had similar problems when I renamed tasks (The new name is shown
> correctly in the task editor, but doesn't get updated in the task list.

The task summary displayed in the task list reflects the summary of the
issue in the repository. It will be updated once an issue is submitted.

> Anything that I can do about this? I can only think of re-creating my
> task filter, but I'm afraid that this might wipe out my my task contexts?

Have you tried using the Synchronize button in the task editor?

Deleting a query will not delete task contexts as long as the tasks are not
deleted from the Unmatched category. I don't think this will help though, I
would recommend manually synchronizing stale tasks by pressing F5 in the
Task List or using the Task Editor.

Steffen
Previous Topic:WikiText preview
Next Topic:Dealing with same file in two separate change sets
Goto Forum:
  


Current Time: Thu Apr 25 02:04:56 GMT 2024

Powered by FUDForum. Page generated in 0.02964 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top