Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Archived » Service Oriented Architecture Tools Platform (STP) » Flow between two events in two pools.
Flow between two events in two pools. [message #614219] Mon, 07 April 2008 12:25 Go to next message
Sara is currently offline SaraFriend
Messages: 16
Registered: July 2009
Junior Member
Hi,

I'm new in BPMN modeler. I know a little a BPMN but I haven't got
opportunity to use it in Eclipse BPMN modeler.
Does anybody know is possible paint flow between two events in two
different pools. I know that possible is paint a flow between two
activities in two different pools. Maybe I do something wrong.

Thank you for any help.

Best regards,
Sara
Re: Flow between two events in two pools. [message #614227 is a reply to message #614219] Mon, 07 April 2008 12:35 Go to previous messageGo to next message
Eclipse UserFriend
Originally posted by: atoulme.intalio.com

Sara, you can connect two events with a messaging edge.

Please see the diagram on the STP BPMN website for a visual example:

http://www.eclipse.org/stp/bpmn/images/due_diligence.gif
You can also try out some BPMN sample diagrams:

http://wiki.eclipse.org/STP/BPMN_Component/Samples

Thanks,

Antoine

Sara wrote:
> Hi,
>
> I'm new in BPMN modeler. I know a little a BPMN but I haven't got
> opportunity to use it in Eclipse BPMN modeler. Does anybody know is
> possible paint flow between two events in two different pools. I know
> that possible is paint a flow between two activities in two different
> pools. Maybe I do something wrong.
> Thank you for any help.
>
> Best regards,
> Sara
>
>
Re: Flow between two events in two pools. [message #614232 is a reply to message #614227] Mon, 07 April 2008 13:04 Go to previous messageGo to next message
Sara is currently offline SaraFriend
Messages: 16
Registered: July 2009
Junior Member
Hi Antoine,

Thanks for your response.
Yes, I saw this examples but I didn't find there any situation like I was
looking for.
In BPMN modeler we can't do something like:
1) Intermediate event in one pool - flow (dashed line) - start event in
second pool
2) Start event in one pool - dashed line - intermediate event in second
pool
3) Start event in one pool - dashed line - end event in second pool, am I
right? I know that this tree situations are consistent with BPM Notation.

BTW. I know that in BPMN modeler we can do something like: End event in
one pool - flow (dashed line) - Start / Intermediate event in in second
pool.

Thanks,
Sara
Re: Flow between two events in two pools. [message #614235 is a reply to message #614232] Mon, 07 April 2008 13:11 Go to previous messageGo to next message
Eclipse UserFriend
Originally posted by: atoulme.intalio.com

Sara, only intermediate message events can send and receive messages, so
only them are allowed to draw messaging edges, along with multiple and
signal events since we added BPMN 1.1 support.

Thanks,

Antoine

Sara wrote:
> Hi Antoine,
>
> Thanks for your response. Yes, I saw this examples but I didn't find
> there any situation like I was looking for. In BPMN modeler we can't do
> something like:
> 1) Intermediate event in one pool - flow (dashed line) - start event in
> second pool
> 2) Start event in one pool - dashed line - intermediate event in second
> pool
> 3) Start event in one pool - dashed line - end event in second pool, am
> I right? I know that this tree situations are consistent with BPM Notation.
>
> BTW. I know that in BPMN modeler we can do something like: End event in
> one pool - flow (dashed line) - Start / Intermediate event in in second
> pool.
>
> Thanks,
> Sara
>
Re: Flow between two events in two pools. [message #614236 is a reply to message #614235] Mon, 07 April 2008 13:21 Go to previous messageGo to next message
Sara is currently offline SaraFriend
Messages: 16
Registered: July 2009
Junior Member
Antoine, you are right. I forgot add that I think about message events ;)
Thanks for help and information that I can find this support in BPMN 1.1.

BTW. Is it possible download BPMN 1.1 from somewhere because I didn't saw
it anywhere?

Thanks,
Sara
Re: Flow between two events in two pools. [message #614254 is a reply to message #614236] Tue, 08 April 2008 10:10 Go to previous message
Eclipse UserFriend
Originally posted by: atoulme.intalio.com

Sara, just go grab the latest build. BPMN 1.1 is on by default.

If you want the BPMN 1.1 specification from the OMG, just go and get it
here:
http://www.omg.org/spec/BPMN/1.1/

Thanks,

Antoine

Sara wrote:
> Antoine, you are right. I forgot add that I think about message events ;)
> Thanks for help and information that I can find this support in BPMN 1.1.
>
> BTW. Is it possible download BPMN 1.1 from somewhere because I didn't
> saw it anywhere?
>
> Thanks,
> Sara
>
Previous Topic:I have problem starting the BPMN modeler
Next Topic:Re: Flow between two events in two pools.
Goto Forum:
  


Current Time: Thu Mar 28 13:14:01 GMT 2024

Powered by FUDForum. Page generated in 0.03626 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top