Activity detail diagrams [message #580532] |
Wed, 18 July 2007 22:34 |
Jorge Gomez Sanz Messages: 16 Registered: July 2009 |
Junior Member |
|
|
Hello all
I am new to the tool, but I must recognise I am enjoying it.
Nevertheless, there is a problem that is getting me crazy. It is about
activity detail diagrams, concretely, trying to create them.
Under what conditions can an activity detail diagram be created? The help
does not concrete this. Besides, I made an experiment whose results are
puzzling.
I go to the library view, to a process WBS, select an iteraction with tasks
and try to create this activity detail diagram by right clicking and
navigating in the popup. The creation option for these diagrams in this
scenario is disabled.
I go to the capability patterns and create a pattern. Under the pattern I
create several tasks. Following, I try to create an activity detail diagram
the same way, this time the option is enabled. Then I create an activity
and try the same again. The option is enabled still. I switch the tab and
get back to the WBS. I try again to create the activity detail diagram
through the popup and this time, while being the same configuration, the
creation option is disabled.
So at this point, and after this wandering, you can understand my confusion
and the original question: when activity detail diagrams can be created?
I will appreciate any help you can provide.
Regards
Jorge
|
|
|
Powered by
FUDForum. Page generated in 0.02626 seconds