Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Eclipse Projects » Nebula » CDateTime drop down calendar issue
CDateTime drop down calendar issue [message #54120] Mon, 02 June 2008 12:53 Go to next message
Marco Maccaferri is currently offline Marco MaccaferriFriend
Messages: 147
Registered: July 2009
Senior Member
Hi.

I'm trying to integrate the CDateTime widget with DROP_DOWN style on an
RCP application on Linux. The buttons on the drop down calendar are not
working, clicking on a day doesn't change the date, nor it is possible
to change month or any other action.

I've ran the CDateTime snippet and it works perfectly, however if placed
without other changes on the RCP app. it doesn't work. No exceptions, no
messages, nothing at all. It simply doesn't work. Any hint on what may
be wrong with it ?

Regards,
Marco.
Re: CDateTime drop down calendar issue [message #54147 is a reply to message #54120] Mon, 02 June 2008 13:18 Go to previous message
Marco Maccaferri is currently offline Marco MaccaferriFriend
Messages: 147
Registered: July 2009
Senior Member
On 02/06/2008 14:53 Marco Maccaferri ha scritto:

> I've ran the CDateTime snippet and it works perfectly, however if placed
> without other changes on the RCP app. it doesn't work. No exceptions, no
> messages, nothing at all. It simply doesn't work. Any hint on what may
> be wrong with it ?

Ah, apparently I've hit bug #185739:
https://bugs.eclipse.org/bugs/show_bug.cgi?id=185739

I don't know if it is a regression or what, my SWT version is 3349 and
it doesn't work. If I set SWT_MODAL_FIX_VERSION to 3400 the calendar works.

Regards,
Marco.
Re: CDateTime drop down calendar issue [message #590295 is a reply to message #54120] Mon, 02 June 2008 13:18 Go to previous message
Marco Maccaferri is currently offline Marco MaccaferriFriend
Messages: 147
Registered: July 2009
Senior Member
On 02/06/2008 14:53 Marco Maccaferri ha scritto:

> I've ran the CDateTime snippet and it works perfectly, however if placed
> without other changes on the RCP app. it doesn't work. No exceptions, no
> messages, nothing at all. It simply doesn't work. Any hint on what may
> be wrong with it ?

Ah, apparently I've hit bug #185739:
https://bugs.eclipse.org/bugs/show_bug.cgi?id=185739

I don't know if it is a regression or what, my SWT version is 3349 and
it doesn't work. If I set SWT_MODAL_FIX_VERSION to 3400 the calendar works.

Regards,
Marco.
Previous Topic:CDateTime drop down calendar issue
Next Topic:CTableTree
Goto Forum:
  


Current Time: Thu Apr 25 14:50:18 GMT 2024

Powered by FUDForum. Page generated in 0.02995 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top