Synchronizing a task in the editor [message #34114] |
Mon, 22 October 2007 23:07 |
Eclipse User |
|
|
|
Originally posted by: baksoy.collab.net
Hi,
I am trying to synchronize a task in the Task Editor. As far as I
understand, the new (downloaded) RepositoryTaskData is used only if the
value of DateModified attribute is changed. However, there might be some
changes performed on the task that don't affect the DateModified
attribute. Therefore, synchronization in the editor does not reflect the
changes in the repository. Is there a way to make
RepositorySynchronizationManager#checkHasIncoming(...) method to make
its decision based on an attribute other than/in addition to
DateModified attribute.
thanks,
|
|
|
Re: Synchronizing a task in the editor [message #35057 is a reply to message #34114] |
Sat, 03 November 2007 02:13 |
Eclipse User |
|
|
|
Originally posted by: beatmik.acm.org
Hi Baybora,
Could you please send this question to the mylyn-integrators list?
http://www.eclipse.org/mylyn/community/
Mik
Baybora Aksoy wrote:
> Hi,
>
> I am trying to synchronize a task in the Task Editor. As far as I
> understand, the new (downloaded) RepositoryTaskData is used only if the
> value of DateModified attribute is changed. However, there might be some
> changes performed on the task that don't affect the DateModified
> attribute. Therefore, synchronization in the editor does not reflect the
> changes in the repository. Is there a way to make
> RepositorySynchronizationManager#checkHasIncoming(...) method to make
> its decision based on an attribute other than/in addition to
> DateModified attribute.
>
> thanks,
|
|
|
|
Powered by
FUDForum. Page generated in 0.03320 seconds