Combined Component 1.1 Draft Plan

Last revised 16 May, 2007 11.15 EST. indicates changes over the previous version.

This is the combined draft plan for the EMF Query, Transaction, and Validation components. Please send comments about this draft plan to the emf-dev@eclipse.org developer mailing list or the eclipse.tools.emf newsgroup.

Plan Item Queries
  By Status:
 
All Open | All Resolved | All Items
  By Milestone:
 
1.1 M4 | 1.1 M5 | 1.1 M6 | 1.1 M7
  Other Items:
 
Help Wanted | Unassigned

Milestone Plans

Milestone Plan (1.1 M4)
Key Dates
  • R1.1 Milestone 4: 22 December, 2006
  • Last day of development: 15 December, 2006
  • Build/test/fix pass: 19 December, 2006
Plan details
 

Design for Extensibility -- Be a Better Platform

  • [VF] Allow a single constraint to report multiple problems
  • [MT] Support removal of models from the transactional environment
 
Milestone Plan (1.1 M5)
Key Dates
  • R1.1 Milestone 5: 16 February, 2007
  • Last day of development: 9 February, 2007
  • Build/test/fix pass: 13 February, 2007
Plan details
 

Enable Consistent Multi-language Support

  • [MQ] ICU4J. Isolate and minimize dependency on ICU4J; ensure support for the 'thin' variant of ICU4J.
  • [MT] ICU4J. Isolate and minimize dependency on ICU4J; ensure support for the 'thin' variant of ICU4J.
  • [VF] ICU4J. Isolate and minimize dependency on ICU4J; ensure support for the 'thin' variant of ICU4J.
 

Design for Extensibility -- Be a Better Platform

  • [MT] Add notification of lifecycle events for transactions and editing domains.
 
Milestone Plan (1.1 M6: API Freeze)
Key Dates
  • R1.1 Milestone 6: 30 March, 2007
  • Last day of development: 23 March, 2007
  • Build/test/fix pass: 27 March, 2007
Plan details
 

Design for Extensibility -- Be a Better Platform

  • [MT] Dynamic-awareness: support run-time changes to extensions.
  • [VF] Dynamic-awareness: support run-time changes to extensions.
 
Milestone Plan (1.1 M7: RC0)
Key Dates
  • R1.1 Milestone 7 (RC0): 11 May, 2007
  • Last day of development: 4 May, 2007
  • Build/test/fix pass: 8 May, 2007
Plan details
 

Simple to Use

  • [MQ] Improved Documentation. Develop a complete Programmer's Guide for the Query subcomponent.
  • [MT] Improved Documentation. Develop a complete Programmer's Guide for the Transaction subcomponent.
  • [VF] Improved Documentation. Develop a complete Programmer's Guide for the Validation subcomponent.
 
 
Legend
item is under development. item is under investigation or help is wanted.
item is finished. item is not started.