| Re-scheduling Sapphire 0.3.1 release [message #688084] |
Thu, 23 June 2011 18:01  |
Konstantin Komissarchik Messages: 769 Registered: July 2009 |
Senior Member |
|
|
The current schedule has Sapphire 0.3.1 shipping on September 1st while Indigo SR1 is scheduled for September 30th. That mis-alignment was driven by Oracle adopter requirements. These requirements no longer exist and I would like to re-align our 0.3.1 release with Indigo SR1.
Would this change in schedule present a problem for other adopters? We can schedule multiple 0.3.x releases if necessary, but if I don't hear otherwise, I will assume that the schedule change is ok with everyone.
- Konstantin
|
|
|
|
|
|
|