Hello,

and one more question Smile

I looked in the source-code and the revoke duration is fixed to 48 hours. Must/should this be this way?

In my testenvironment I pulled out and revoked packages for testing. Then I wanted to modify these and finally redeploy the packages.

The notification with the revoke duration appeared. So created further packages to redeploy the artifacts.

Regards,

Per Sterner
Re: Revoke duration question [message #1221044 is a reply to message #1219869] Mon, 16 December 2013 14:00 Go to previous message
Gunnar Wagenknecht is currently offline Gunnar Wagenknecht
Messages: 447
Registered: July 2009
Senior Member
Hi,

On 2013-12-06 12:09:22 +0000, Per Sterner said:
> I looked in the source-code and the revoke duration is fixed to 48
> hours. Must/should this be this way?

It's actually a very poor first version of the algorithm to give nodes
some time to de-install software. Ideally, nodes should report
installation and uninstallation of each package. A future version of
the algorithm would use this data.

-Gunnar


--
Gunnar Wagenknecht
gunnar@xxxxxxxx