Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Eclipse Projects » BPMN 2.0 Modeler » Sequence Flows connection Bug
Sequence Flows connection Bug [message #1006744] Fri, 01 February 2013 11:31 Go to next message
Hassan BAZOUN is currently offline Hassan BAZOUN
Messages: 48
Registered: April 2012
Member
Hello,

In page 112 of the BPMN2.0 spec it was clearly stated that

Quote:
A Pool acts as the container for the Sequence Flows between Activities (of a contained Process). The Sequence Flows can cross the boundaries between Lanes of a Pool (see page 305 for more details on Lanes), but cannot cross the boundaries of a Pool. That is, a Process is fully contained within the Pool. The interaction between Pools is
shown through Message Flows


In the BPMN2.0 modeler it is always possible to connect two tasks which belong to two different pools, via a sequence flow.

So i think this should be reported as a bug, what do you think?

Thanks.
HB

[Updated on: Fri, 01 February 2013 11:32]

Report message to a moderator

Re: Sequence Flows connection Bug [message #1006759 is a reply to message #1006744] Fri, 01 February 2013 12:14 Go to previous message
Robert Brodt is currently offline Robert Brodt
Messages: 542
Registered: August 2010
Location: Colorado Springs, CO
Senior Member

Hi Hassan, and thanks again for keeping me honest Smile Yes, this is a known bug but I haven't recorded it yet as it hasn't made it to the top of my priority list. Can you please file a bug report?

Thanks you!
Bob
Previous Topic:Message Flow Connection rules and Task's attributes
Next Topic:Own Extensions for the metamodel & modeler
Goto Forum:
  


Current Time: Wed Apr 23 20:39:55 EDT 2014

Powered by FUDForum. Page generated in 0.03284 seconds