Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Eclipse Projects » Jubula » Can i switch to different aut in the middle of test suite? (Switch between two aut in middle of test suite execution)
Can i switch to different aut in the middle of test suite? [message #1007902] Thu, 07 February 2013 23:45 Go to previous message
Rajesh Dash is currently offline Rajesh Dash
Messages: 29
Registered: January 2013
Junior Member
I am using jubula to test multiple instance of same application one for transmitter and one for receiver.In transmitter side i am entering some data in text field and than clicking transmit and receiver side i have to check whether it is proper or not.So i want to know that when i am reading data from excel sheet for transmitter it is reading all the data at a time can i took one data from execelsheet for transmitter than switch to receiver (in different aut) and check it and again switch back to transmitter aut and take another data from excel sheet and so on..Is it possible or not.Is there something available which will switch between two aut in the middle of the test suite execution.
 
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic:How to validate the test result with db/device data?
Next Topic:How can i extend jubula to detect pshelf widget given by nebula?
Goto Forum:
  


Current Time: Sat May 25 15:21:10 EDT 2013

Powered by FUDForum. Page generated in 0.01645 seconds