| GanttChart : problem with GanttGroup [message #594735] |
Tue, 05 May 2009 09:43 |
Emmanuelle Capdevielle Messages: 2 Registered: July 2009 |
Junior Member |
|
|
Hello,
I'm using GanttEvents and GanttGroups into my GanttChart and I have a
little problem.
I'm using GanttChart combined to a tree, just as shown into the example.
I've got events (or groups of events) for each leaf of my tree, and I need
to have copies of these events at the node level, just like a summary.
To do that, I link my node to a GanttGroup and, when I create an Event for
one of the leaves, I copy it and add the copy into the node group.
But the copy is set following the previous events, instead of being into
the node line.
I think that this issue is due to SWT concepts but i cannot find a way to
bypass it.
I just need to add an event to an existing GanttGroup, i.e. graphically
into its line.
Can any of you help me?
Thanks
Emmanuelle
|
|
|