I have a report that contains a bar chart. The bar chart series will
have a drill-through to another report.
I'd like to be able to change the report that the interactivity
drills-through based on a report parameter, but I'm a bit confused on
how to access/change the drill-through on a chart series in a script.
On 7/22/2010 12:16 PM, Dave Remkus wrote:
> I have a report that contains a bar chart. The bar chart series will
> have a drill-through to another report.
>
> I'd like to be able to change the report that the interactivity
> drills-through based on a report parameter, but I'm a bit confused on
> how to access/change the drill-through on a chart series in a script.
>
> Can it be done? Any suggestions?
>
> Thanks