| Differences between actual and future Method Content [message #1060053] |
Wed, 22 May 2013 13:29 |
 |
Henk Wolthuis Messages: 1 Registered: May 2013 |
Junior Member |
|
|
Hi,
I hope that the following application of EPF Composer is a valid feature:
a) I want to configure an actual (sub-)set of tasks, roles, products and processes (IST-situation);
b) Then I want to define and configure the (disired)future (sub-)set of tasks et cetera . . . I've only changed 1 process (SOLL-situation).
How can I derive the differences between the actual and the disired process-model?
(Then a have the transition- migration information in my hands!)
If it's not a known feature of EPF Composer, maybe you can specify with wich Eclipse package|project this is possible?
I hope somebody can help,
Kind regards,
Henk
[Updated on: Thu, 23 May 2013 12:28] Report message to a moderator
|
|
|
Powered by
FUDForum. Page generated in 0.01468 seconds