| Message Flow connection rules [message #999225] |
Fri, 11 January 2013 10:40  |
Hassan BAZOUN Messages: 48 Registered: April 2012 |
Member |
|
|
Hello,
In the specification "Business Process Model and Notation" OMG Document Number: formal/2011-01-03, which represents the official and standard specification of BPMN2.0,
Message Flow connection rules were clearly specified and can be summerized in Table 7.4.
One of these rules is that a pool can be connected to a subProcess via a message flow, but in the BPMN 2.0 Modeler this is not possible.
why this is not possible? is it a bug?
if its not a bug, on what specification are you based on?
Thanks in advance,
HB
[Updated on: Fri, 11 January 2013 11:01] Report message to a moderator
|
|
|
|
|
Powered by
FUDForum. Page generated in 0.03024 seconds